Tekmar 363 Universal Reset Control Installation Manual de usuario Pagina 20

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 19
20 of 40
Copyright © D 363 -12/08
Boiler Demand
If a
Boiler Demand
is used, measure the voltage between the
Boil Dem
and the
Com Dem
terminals (4 and 3). When the
Boiler Demand
device
calls for heat, you should measure between 20 and 260 V (ac) at the
terminals. When the
Boiler Demand
device is off, you should measure
less than 5 V (ac).
DHW Demand
If a
DHW Demand
is used, measure the voltage between the
Setp /
DHW
and the
Com Dem
terminals (5 and 3). When the
DHW Demand
device calls for heat, you should measure between 20 and 260 V (ac)
at the terminals. When the
DHW Demand
device is off, you should
measure less than 5 V (ac).
Setpoint Demand
If a
Setpoint Demand
is used, measure the voltage between the
Setp /
DHW
and the
Com Dem
terminals (5 and 3). When the
Setpoint
Demand
device calls for heat, you should measure between 20 and
260 V (ac) at the terminals. When the
Setpoint Demand
device is off,
you should measure less than 5 V (ac).
Testing the Outputs
Boiler Pump (Boil P1)
If a boiler pump is connected to the
Boil P1
terminal (8), make sure that power to the
terminal block is off and install a jumper between the
Power L
and the
Boil P1
terminals
(7 and 8). When power is applied to the
Power N
and
Power L
terminals (6 and 7), the
boiler pump should start. If the pump does not turn on, check the wiring between the
terminal block and pump and refer to any installation or troubleshooting information
supplied with the pump. If the pump operates properly, disconnect the power and remove
the jumper.
DHW Pump OR Valve (DHW Pmp/Vlv)
If a DHW pump or DHW valve is connected to the
DHW Pmp / Vlv
terminals (9 and 10),
make sure the power to the pump or valve circuit is off and install a jumper between those
terminals. When the DHW circuit is powered up, the DHW pump should turn on or the
DHW valve should open completely. If the DHW pump or valve fails to operate, check the
wiring between the terminals and the pump or valve and refer to any installation or
troubleshooting information supplied with these devices. If the DHW pump or valve
operate correctly, disconnect the power and remove the jumper.
Mixing Pump (Mix P2)
If a mixing pump is connected to the
Mix P2
terminal (11), make sure that power to the
terminal block is off and install a jumper between the
Power L
and the
Mix P2
terminals
(7 and 11). When power is applied to the
Power N
and
Power L
terminals (6 and 7), the
mixing pump should start. If the pump does not turn on, check the wiring between the
terminal block and pump and refer to any installation or troubleshooting information
supplied with the pump. If the pump operates properly, disconnect the power and remove
the jumper.
Boiler
If the boiler is connected to the
Boiler
terminals (12 and 13), make sure power to the boiler circuit is off and install a jumper between
the terminals. When the boiler circuit is powered up, the boiler should fire. If the boiler does not turn on, refer to any installation or
troubleshooting information supplied with the boiler. (The boiler may have a flow switch that prevents firing until the boiler pump
(P1) is running.) If the boiler operates properly, disconnect the power and remove the jumper.
Variable Speed Injection Pump
If a variable speed injection pump circuit is connected to the
Pwr Mix
and
Cls / Var
terminals (14 and 16), make sure the power to
the terminal block is off and install a jumper between the
Pwr Mix
and
Cls / Var
terminals (14 and 16). When the variable speed
pump circuit is powered up, the variable speed pump should operate at full speed. If the pump does not operate, check the wiring
between the terminal block and the pump and refer to any installation or troubleshooting information supplied with the pump. If the
pump operates properly, disconnect the power and remove the jumper.
V
20 to 260 V (ac)
V
3
4
Com
Dem
Boil
Dem
V
20 to 260 V (ac)
V
3
4
Boil
Dem
5
Setp/
DHW
Com
Dem
120 V (ac)
7
8
L
P1
Boil
L
N
6
N
Power
24 to 240 V (ac)
9
10
DHW
Pmp/Vlv
M
or
120 V (ac)
L
7
11
Mix
P2
L
N
Vista de pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 39 40

Comentarios a estos manuales

Sin comentarios